E. Progress reports on research contracts and associated papers
E181. J.D. Jackson, ‘Research on the life and work of Osborne Reynolds’, 2nd Year Progress Report for the Leverhulme Trust on an Emeritus Fellowship Award, (Grant number AA01698), August 2005.
E180. J.D.
Jackson, A. Fok and
E179. J.D. Jackson, ‘Research on the life and work of Osborne Reynolds’, 1st Year Progress Report for the Leverhulme Trust on an Emeritus Fellowship Award, (Grant number AA01698), August 2004.
E.178. J.D.
Jackson, ‘Forced and mixed convective heat transfer with supercritical pressure
carbon dioxide’, 2nd Year Progress Report on Royal Society Joint
China Project with
E.177. J.D.
Jackson, A. Fok and
E176. J.D.
Jackson, ‘Forced and mixed convective heat transfer with supercritical pressure
carbon dioxide’, 1st Year Progress Report on Royal Society Joint
China Project with
E175. J.D.
Jackson, ‘Scaling of nuclear reactor containment experiments’, Progress Report
No. 3, European Commission Concerted Action SCACEX (Contract number
FIRI-CT2001-20127), Presented in
E174. J.D. Jackson and W.S. Kim, 'Computational studies of turbulent mixed convection heat transfer to air in a vertical passage of annular cross section’, Progress Report No. 2 for the UK Health and Safety Executive (Contract number HTH/GNSR/14), October 2002.
E173. J.D.
Jackson, ‘Scaling of nuclear reactor containment experiments’, Progress Report
No. 2, European Commission Concerted Action SCACEX (Contract number
FIRI-CT2001-20127), Presented in
E172. J.D. Jackson and W.S. Kim, 'Computational studies of turbulent mixed convection heat transfer to air in a vertical passage of annular cross section’, Progress Report No. 1 for the UK Health and Safety Executive (Contract number HTH/GNSR/14), May 2002.
E171. J.D.
Jackson, ‘Scaling of nuclear reactor containment experiments’, Progress Report
No. 1 for European Commission Concerted Action SCACEX (Contract number
FIRI-CT2001-20127), Presented in
E170. J.D. Jackson, J. Li and J. Wang, ‘Studies of buoyancy-influence shield cooling airflow’, Annual Report on BNFL Magnox Generation, Contract number PM/MAG/5109, January 2002.
E169. J.D. Jackson and T. Wu, ‘Studies of flow and heat transfer in vertical annular spaces – Phase 1’, Annual Report for British Energy Generation Ltd., Contract number PM/GNSR/5107, January 2002.
E168. J.D. Jackson, J. Li and J. Wang, ‘Experiment
to study shield cooling airflow and heat transfer around Magnox RPV outlet gas
ducts’, Progress Report No. 5 on research contract under IMC Contract
HTH/MAG/5052, Magnox Electric Contract No. TE/G/00458/N, April 2001.
E167. J.D. Jackson, J. Li, P. Jiang and J. Wang,
‘Experiment to study shield cooling airflow and heat transfer around Magnox RPV
outlet gas ducts’, Progress Report No. 4 on research contract under IMC
Contract HTH/MAG/5052, Magnox Electric Contract No. TE/G/00458/N, January 2001.
E166. J.D. Jackson, J. Li, P. Jiang and J. Wang.
‘Experiment to study shield cooling airflow and heat transfer around Magnox RPV
outlet gas ducts’, Progress Report No. 3 on research contract under IMC
Contract HTH/MAG/5052, Magnox Electric Contract No. TE/G/00458/N, November
2000.
E165. J.D. Jackson, P. An and M. Walker.
‘Investigation of flows in through filters’, Report on the Design and
Commissioning of a Test Facility for studying flow through SRV Filter
Material’, Work for British Energy Generation Ltd. on IMC Contract reference
HTH/GNSR/5051, Contract BB/E/41359, July 2000.
E164. J.D. Jackson and J. Li. ‘Experiment to study
shield cooling airflow and heat transfer around Magnox RPV outlet gas ducts’,
Progress Report No. 2 on research contract under IMC Contract HTH/MAG/5052,
Magnox Electric Contract No. TE/G/00458/N, February 2000.
E163. J.D. Jackson and J. Li. ‘Experiment to study
shield cooling airflow and heat transfer around Magnox RPV outlet gas ducts’,
Progress Report No. 1 on research contract under IMC Contract HTH/MAG/5052,
Magnox Electric Contract No. TE/G/00458/N, December 1999.
E162. J.D. Jackson and J. Li. ‘Yearly Progress Report for the period
January to December 1999 on the Naturally Induced Cooling Experiment (NICE)’,
DABASCO Project (Contract No. F14S-CT96-0042), EU 4th Framework Programme on
Nuclear Fission Safety, December 1999.
E161. J.D. Jackson and J. Li. ‘Half Yearly Progress
Report for the period January to June 1999 on the Naturally Induced Cooling
Experiment (NICE), DABASCO Project (Contract No. F14S-CT96-0042), EU 4th
Framework Programme on Nuclear Fission Safety, July 1999.
E160. J.D. Jackson and J. Li. ‘The Naturally Induced Cooling Experiment
(NICE)’, Annual Progress Report for the period January to December 1998 on DABASCO
Project (Contract No. F14S-CT96-0042)-CONT-DABASCO(99)-D001, EU 4th
Framework Programme on Nuclear Fission Safety, December 1998.
E159. J.D. Jackson with X. Cheng, P. Bazin, P.
Cornet, D. Hittner, J. Lopez Jimenez, A. Naviglio, F. Oriolo and K.G.
Petzold. ‘DABASCO Project’, Annual Progress
Report for the period January to December 1998, European Commission Fourth
Framework on Nuclear Fission Safety (Contract No. F14S-CT96-0042)
-CONT-DABASCO(99)-POO1, December 1998
E158. J.D. Jackson, J. Li and P. An. ‘The Naturally
Induced Cooling Experiment (NICE)’, Half Yearly Progress Report for the period
January to June 1998 on ‘DABASCO Project’ (Contract No.
F14S-CT96-0042)-CONT-DABASCO(98)-D007, EU 4th Framework Programme on
Nuclear Fission Safety, June 1998.
E157. J.D. Jackson with X. Cheng, P. Bazin, P.
Cornet, D. Hittner, B. Herrero, A. Naviglio, F. Oriolo and K.G. Petzold. ‘DABASCO
Project’, Half-Yearly Progress Report for the period January to June 1998,
European Commission Fourth Framework on Nuclear Fission Safety (Ref
F14S-CT96-0042) -CONT-DABASCO(98)-POO2, July 1998.
E156. J.D. Jackson with D. Tenchine, M. Berthoux,
J.U. Knebel, P.An, A. Naviglio and G. Caruso. ‘POOLTHY Project’, Half Yearly
Progress Report on (FI4ICT950003), EU 4th Framework Programme on
Nuclear Fission Safety, July 1998.
E155. J.D. Jackson and P. An. 'MUCON Project’
Progress Report for the period January - June 1998, EC 4th Framework
Programme Project POOLTHY, June 1998.
E154. J.D. Jackson, S. He, H. Liang, J. Li, M.A.
Walker and C. Talbot. ‘Investigation of
convective heat transfer in a vertical passage under buoyancy-influenced
conditions’. Progress Report of HSE
Contract HTH/GNSR/22 Basic Studies in Nuclear Thermal Hydraulics, April 1998.
E153. J.D. Jackson, J. Li and Pei An. ‘Naturally
Induced Cooling Experiment (NICE)’, Progress Report for the Year 1997, EC 4th
Framework Project DABASCO, December 1997.
E152. J.D. Jackson and P. An. ‘MUCON Project Annual Progress Report for the
Year 1997’, EC 4th Framework POOLTHY Programme, December 1997.
E151. J.D. Jackson and P. An. ‘Manchester University Condensation
Experiments (MUCON)’, Progress of work and results obtained in the Year 1997,
December 1997.
E150. J.D. Jackson with D. Tenchine, J.U. Knebel,
A. Naviglio, ‘POOLTHY Project’, Yearly Progress Report, European Commission
Fourth Framework on Nuclear Fission Safety (Ref E141CT950003) - INNO-POOLTHY
(98) - P009, December 1997.
E149. J.D. Jackson with X. Cheng, P. Bazin, P.
Cornet, D. Hittner, J. Lopez - Jiminez, A. Naviglio, F. Oriolo and H. Plank, ‘DABASCO
Project’, Yearly Progress Report, European Commission Fourth Framework on
Nuclear Fission Safety (Ref F14S-CT96-0042) -CONT-DABASCO(98)-POOL, December,
1997.
E148. J.D. Jackson, J. Li and P. An, ‘Design Report
on Naturally Induced Cooling Experiment’, European Commission Fourth Framework
DABASO Project, November 1997.
E147. J.D. Jackson with D. Tenchine, M. Berthoux,
J.U. Knebel, P.An, A. Naviglio and G. Caruso. ‘POOLTHY Project’, Half Yearly
Progress Report on (FI4ICT950003), EU 4th Framework Programme on
Nuclear Fission Safety, July 1997.
E146. J.D. Jackson with X. Cheng, P. Bazin, P.
Cornet, D. Hittner, J.K. Li, P. An, J. Lopez Jiminez, B. Herrero, A. Naviglio,
G. Caruso, F. Oriolo, W. Ambrosine, H. Plank, K.G. Petzold. ‘DABASCO Project’, Half-yearly progress
report (January - June 97) for DABASCO Project (Contract No. FI4S-CT96-0042),
EU 4th Framework Programme on Nuclear Fission Safety, July 1997.
E145. J.D. Jackson and P. An. 'MUCON Project’,
Progress Report for the period January - June 1997, EC 4th Framework Programme
Project POOLTHY, June 1997.
E144. J.D. Jackson, J. Li and P. An. 'Naturally Induced Cooling Experiments (NICE)
- Progress and Results', DABASCO EC Programme, First Half Yearly Progress
Report, June1997.
E143. J.D. Jackson, J. Li and P. An. 'Naturally Induced Cooling Experiments with
application to advanced nuclear reactor containment passive cooling', DABASCO
EC Programme - Naturally Induced Cooling Experiments (NICE), Progress Report
for 1st Progress Meeting at FzK Karlsruhe, February 1997.
E142. J.D. Jackson, P. An, D. Tenchine, M.
Berthoux, F.J. Erbacher, J.U. Knebel and A. Naviglio. Yearly Progress Report on
POOLTHY Project (FI4ICT950003), EC 4th Framework Programme on
Nuclear Fission Safety, INNO-POOLTHY(97)-P006, December 1996.
E141. J.D. Jackson and P. An. '
E140. J.D. Jackson and P. An. '
E139. J.D. Jackson, Shuisheng He and Jin Min
Song. 'Generic thermal convection
experimental studies'. Design study
report for Phase I Nuclear Electric contract BB/G/40329 IMC Ref HTH/GNSR/5029,
August 1996.
E138. J.D. Jackson with D. Tenchine, F.J. Erbacher
and A. Naviglio. ‘The POOLTHY Project’, Progress
Report on EC 4th Framework Programme on Nuclear Fission Safety, Contract
F14ICT9 50003, July 1996.
E137. J.D. Jackson, J.E. Byrne and P. An. 'Manchester University Condesation
Experiments (MUCON)', EC 4th Framework Programme Project POOLTHY, Half yearly
Progress Report, June 1996.
E136. J.D. Jackson.
`The Naturally Induced Cooling Experiment (NICE) -
E135. J.D. Jackson and Shuisheng He. `Modelling of flow and temperature fields in
the presence of strong buoyancy influences'.
Progress Report 2 on research work under Nuclear Electric Contract
BL/G/30938/T, March 1995.
E134. J.D. Jackson and Shuisheng He. `Modelling of flow and temperature fields in
the presence of strong buoyancy influences'.
Progress Report No. 1 on research under Nuclear Electric Contract
BL/G/30938/T, January 1995.
E133. J.D. Jackson and Pei An. `Experimental study
of heat transfer in a vertical heated pipe with naturally-induced flow of air
through it with and without water film cooling'. Progress Report on research under AEA
Technology Agreement RZ 00325Y, September 1994.
E132. J.D. Jackson and Hong Liang. `Experimental studies of the effects of
partial blockage and buoyancy-influence during flow in a heated cluster -
Description of experimental work and interim presentation of results'. Progress Report No. 2 on Nuclear Electric
Contract BLG/22654, February 1994.
E131. J.D. Jackson, A. Anderson and P. An. `Methods for estimating sodium evaporation
rates'. Research Report, October 1993.
E130. J.D. Jackson, A. Anderson and P. An. `Aerosol collection and sodium evaporation
experiments'. Research Report, October
1993.
E129. J.D. Jackson and H. Liang. `Experimental studies of the effect of flow
blockage on buoyancy-influenced flow'.
Progress Report No. 1, Nuclear Electric Contract BLG/22654, September
1993.
E128. J.D. Jackson, P. An and A. Anderson. `Modelling study of the cover gas sodium
aerosol characteristics in the MUSAC 3 rig'.
Sodium Aerosol Studies Project, Research Report, August 1993.
E127. J.D. Jackson, A. Anderson and P. An. `Interpretation of gas injection experiments
on the sodium aerosol studies project'.
Research Report, August 1993.
E126. J.D. Jackson, P. An and A. Anderson. `Tests conducted on the MUSAC 3 rig between
March and May 1993'. Progress Report on the Sodium Aerosol Studies Project,
August 1993.
E125. J.D. Jackson, P. An and A. Anderson. `Sodium aerosol studies project - radiation
measurements test section'. Progress
Report, June 1993.
E124. J.D. Jackson, O. Buyukalaca, C. Zhao, J.H.
Kim, L.H. Zhu and W.H. Salman. `PWR-related research'. Reports on Sizewell `B' Power Station
Research Programme, Nuclear Electric Contract SXB/XK-831, April 1993.
E123. J.D. Jackson and J.M. Chandler. `Preliminary experiments on quenching and
re-wetting of a nickel-chrome alloy rod'.
Report on PWR-related research under Nuclear Electric contract SBX/XX
831, April 1993.
E122. J.D. Jackson.
`PWR-related research'. Outline
Progress Reports, Nuclear Electric Contract SBX/XX831, April 1993.
E121. J.D. Jackson. `Proposals for PWR-related
research for the period April 1993 to March 1994 under the terms of Nuclear
Electric Contract SBX/XX-831', March 1993.
E120. J.D.
E119. J.D.
E118. J.D.
E117. J.D. Jackson.
`Fundamental studies of heat transfer and thermal-hydraulics relevant to
pressurised water reactors. Initial
Progress Report on Nuclear Electric Contract SBX/XX-831, July 1992.
E116. J.D. Jackson, T. Totev and
E115. J.D. Jackson and C.C. Yen. `Some measurements
of the total and spectral emissivity of silicon carbide', Research Report,
March 1992.
E114. J.D. Jackson, T. Totev and
E113. J.D.
E112. J.D.
E111. J.D. Jackson, H. Yang, B. Durkiewicz and P.
Poskas. `Experimental investigation of
flow penetration in a buffer storage tube - Further presentation of
results'. Progress Report No. 4 on
research under Nuclear Electric Contract CON/BC/2109, May 1991.
E110. J.D. Jackson, H. Yang, B. Durkiewicz and P.
Poskas. `Experimental investigation of
flow penetration in a buffer storage tube - Description of experimental work
and interim presentation of results'.
Progress Report No. 3 on research under Nuclear Electric Contract CON/BC/2109,
April 1991.
E109. J.D. Jackson, H. Yang and B. Durkiewicz. `Experimental investigation of flow
penetration in a buffer storage tube - Details of full scale rig at
commissioning stage'. Progress Report
No. 2 on research under Nuclear Electric Contract CON/BC/2109, March 1991.
E108. J.D. Jackson, A. Anderson, Pei An and H.
Yang. `MUSAC 3 Project Research'. Progress Report on NNC Contract
C71/01/D/5050, March 1991.
E107. J.D. Jackson and A. Anderson. `MUSAC 3 Project Research'. Progress Report on NNC Contract
C71/01/D/5050, January 1991.
E106. J.D. Jackson and H. Yang. `Experimental
investigation of flow penetration in a buffer storage tube - Description of
mock-up rig and preliminary results'.
Progress Report No. 1 on research under Nuclear Electric Contract
CON/BC/2109, January 1991.
E105. J.D. Jackson.
`MUSAC 3 Project - Programme of work for the period January 1991 to
March 1992', December 1990.
E104. J.D. Jackson and A. Anderson. `MUSAC 3
Project Research'. Progress Report on
NNC Contract C71/01/D/5050, June 1990.
E103. J.D. Jackson and A. Anderson. `MUSAC 3 Project Research'. Progress Report on NNC Contract
C66/01/D/5050, March 1990.
E102. J.D. Jackson, A. Anderson and
E101. J.D. Jackson. `Safety-related studies
concerned with the low flow rate operation of Advanced Gas Cooled
Reactors'. Research Proposal presented
to the UKAEA Laboratories, Windscale, December 1989.
E100. J.D. Jackson. `Research and development work
at
E99. J.D. Jackson and
E98. J.D. Jackson and
E97. J.D. Jackson, A. Anderson, R.A. Burns and
J.J. Norris. `MUSAC 3 Project Research,
Progress Report on NNC Contract C64/01/D/5050, July 1989.
E96. J.D. Jackson and
E95. J.D. Jackson and Y.L. Sinai. `Proposal for emissivity measurements in the
MUSAC I facility in support of EFR', NNC Reference R&D/2028B, April 1989.
E94. J.D. Jackson and B.P. Axcell. Progress Report on SERC grant GR/D 89303
`Mixed convection heat transfer to sodium in a vertical pipe', March 1989.
E93. J.D. Jackson and
E92. J.D. Jackson and
E91. J.D. Jackson and
E90. J.D. Jackson and
E89. J.D. Jackson. `Programme of work on sodium aerosols from
1988 until 1990'. Proposal prepared for
NNC, November 1988.
E88. J.D. Jackson, K.L.A. Lam and
E87. J.D. Jackson, K.L.A. Lam and
E86. J.D. Jackson and L. Iravanian. `Some measurements of the spectral emissivity
of stainless steel surfaces', Research Report, November 1988.
E85. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR', Progress Report No. 9 on UKAEA Agreement 1R 55693, September
1988.
E84. J.D. Jackson and K.L.A. Lam. `Effect of thin sodium chromite layers on the
emittance of stainless steel specimens'.
Progress Report on UKAEA Agreement 1R 56280A, July 1988.
E83. J.D. Jackson and K.L.A. Lam. `Effect on emissivity of an oxide layer
forming on the free surface of a stagnant pool of liquid sodium'. Progress Report on UKAEA Agreement 1R 54883,
July 1988.
E82. J.D. Jackson, K.L.A. Lam and
E81. J.D. Jackson and E. Romero. `Measurements of turbulence below a free
surface induced by a vertical submerged jet using hot film anemometry
methods'. Progress Report on research
for the UKAEA Winfrith under Agreement WH 36195, July 1988.
E80. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR', Progress Report No. 8 on UKAEA Agreement 1R 55693, July 1988.
E79. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR', Progress Report No. 7 on UKAEA Agreement 1R 55693, April 1988.
E78. J.D. Jackson and K.L.A. Lam. `The emissivity of stainless steel surfaces
promoting condensation of liquid sodium', Progress Report on UKAEA Agreement 1R
54883, January 1988.
E77. J.D. Jackson and K.L.A. Lam. `Measurements of thermal radiation during and
after dryout from stainless steel surfaces having sodium condensate on them',
Progress Report on UKAEA Agreement 1R 54883, January 1988.
E76. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR', Progress Report No. 6 on UKAEA Agreement 1R 55693, January 1988.
E75. J.D. Jackson and L.H. Zhu. `Fast transient boiling experiments in
ethanol and di-ethyl ether'. Progress
Report on research supported by NII Contract NUC 56/9/1, January 1988.
E74. J.D. Jackson and R.A. Burns. `Studies of film boiling heat transfer'. Progress Report on Nuclear Installations
Inspectorate Research Contract NUC 56/9/1, December 1987.
E73. J.D. Jackson, B.P. Axcell, A. Anderson and
R.A. Burns. `Summary of results obtained
using the development rig to investigate the characteristics of sodium aerosols
above a sodium pool'. Progress Report on
the MUSAC 2 Project, NNC Contracts C51 & C50/02/E/5050, November 1987.
E72. J.D. Jackson and B.P. Axcell. `Investigation of mixed convection to sodium
in a vertical pipe'. Proposal for
funding submitted to SERC, November 1987.
E71. J.D. Jackson and K.L.A. Lam. `The emissivity of stainless steel surfaces
promoting dropwise or filmwise condensation of liquid sodium'. Progress Report on work on UKAEA Agreement 1R
54883, October 1987.
E70. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR'. Progress Report No. 5 on UKAEA Agreement 1R 55693, October 1987.
E69. J.D. Jackson with J. Dickson, A.C. Raine
and L. Howard. `Re-wetting of a hot
surface by liquid sodium'. Progress
Report on UKAEA Risley Agreement 4R54182B, August 1987.
E68. J.D. Jackson and K.L.A. Lam. `Experimental rig for the measurement of
thermal radiation from stainless steel surfaces promoting the condensation of
liquid sodium', Progress Report on UKAEA Agreement 1R 54883, July 1987.
E67. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR'. Progress Report No 5 on
UKAEA Agreement 1R 55693, July 1987.
E66. J.D. Jackson, L.H. Zhu and K.P.
Derewnicki. `Comparison of fast
transient nucleation and boiling processes in pressurised water and
ethanol'. Progress Report on research
supported by NII Contract NUC 56/9/1, July 1987.
E65. J.D. Jackson with J. Dickson, A.C. Raine
and L. Howard. `Re-wetting of a hot surface
by liquid sodium'. Progress Report on
UKAEA Risley Agreement 4R54182B, May 1987.
E64. J.D. Jackson and E. Romero. `Directional emissivity characteristics of
grooved specimens having specularly reflecting surfaces', Research Report, May
1987.
E63. J.D. Jackson, A. Anderson, R.A. Burns and
B.P. Axcell. `Preliminary measurements
of sodium aerosol concentration and size distribution in the cover gas above a
sodium pool'. Progress Report on the
MUSAC 2 Project, NNC Contracts 51 & 59/02E/5050, THSG/P(86)308, May 1987.
E62. J.D. Jackson and L. Iravanian. `Commissioning tests on the CAGR glove box
rig', Progress Report No. 4 on UKAEA Agreement 1R 55693, April 1987.
E61. J.D. Jackson and E. Romero. `Enhancement of emissivity by grooving
metallic surfaces', Research Report, March 1987.
E60. J.D. Jackson, A. Anderson and R.A.
Burns. `MUSAC 2 Project'. Progress Report No. 1 on NNC Contracts C51
& 59/02/E/5050, March 1987.
E59. J.D. Jackson with J. Dickson, A.C. Raine
and L. Howard. `Re-wetting of a hot
surface by liquid sodium'. Progress
Report on UKAEA Risley Agreement 4R54182B, January 1987.
E58. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR'. Progress Report No 3 on
UKAEA Agreement 1R 55693, October 1986.
E57. J.D. Jackson and K.L.A. Lam. `Preliminary studies of sodium condensation
and deposition on the underside of the roof of a sodium pool'. Progress Report on work on Authority
Agreement 1R 54883, October 1986.
E56. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR'. Progress Report No. 2 on
research work under UKAEA Agreement 1R 55693, May 1986.
E55. J.D. Jackson, E. Romero, K. Simmons and A.
Anderson. `Calorimetric measurements of
radiant heat transfer from fast reactor fuel can samples', Research Report,
April 1986.
E54. J.D. Jackson and K.L.A. Lam. `Measurements of the emissivity of a
sodium-wetted stainless steel surface prior to and during a heating process
leading to dryout due to evaporation of the sodium', Progress Report on UKAEA
Agreement 1R 54883, April 1986.
E53. J.D. Jackson and E. Romero. `Further measurements of the total
hemispherical emittance of PFR fuel can material. Research Report for the UKAEA, April 1986.
E52. J.D. Jackson, E. Romero and A.
Anderson. `Calorimetric measurements of
the total emittance of PFR fuel can samples'. Research Report for the UKAEA,
April 1986.
E51. J.D. Jackson. `Report on a meeting to
review radiation heat transfer in the cover gas of pool type fast reactors',
INTERATOM, Bensberg, W. Germany, March 1986.
E50. J.D. Jackson and B.P. Axcell. `Investigation into sodium aerosol generation
and the effect on radiant heat transfer in fast reactors'. Proposal Report FREWG/P(85)206 presented to
the Fast Reactor Engineering Working Group, Risley, January 1986.
E49. J.D. Jackson with A.C. Raine, and L.
Howard. `Re-wetting of a hot surface by
liquid sodium'. Progress Report on UKAEA
Risley Agreement 4R54182B, January 1986.
E48. J.D. Jackson, A. Anderson and E.
Romero. `Calorimetric rig for the
measurement of hemispherical emittance of cylindrical stainless steel specimens'. Research Report, January 1986.
E47. J.D. Jackson, B.P. Axcell and J.J.
Norris. `Programme of research on sodium
aerosols and their effect on radiant heat transfer through the cover gas of a
pool-type fast reactor'. Research
Proposal submitted to NNC, December 1985.
E46. J.D. Jackson and L. Iravanian. `Experimental investigation of thermal
radiation from inactive simulations of surface conditions arising in materials
used in CAGR'. Progress Report No. 1 on
UKAEA Agreement 1R 55693, December 1985.
E45. J.D. Jackson and K.L.A. Lam. `Measurements of the emissivity of a shallow
pool of liquid sodium prior to and during evaporation'. Progress Report on UKAEA Agreement 1R 54883,
December 1985.
E44. J.D. Jackson and K.L.A. Lam. `Commissioning tests on the modified glove
box emissivity rig'. Progress Report on
UKAEA Agreement 1R 54883, November 1985.
E43. J.D. Jackson and K.L.A. Lam. `Measurements of the emittance of a shallow
pool of liquid sodium as it is evaporated off a stainless steel surface at a
temperature of 450oC.
Progress Report on UKAEA Agreement 1R 54883, November 1985.
E42. J.D. Jackson with J. Dickson, A.C. Raine
and L. Howard. `Re-wetting of a hot
surface by liquid sodium'. Progress Report on UKAEA Risley Agreement 4R54182B,
August 1985.
E41. J.D. Jackson and L. Iravanian. `Effects of surface preparation and treatment
on the emissivity of type 316 stainless steel specimens'. Research Report, July 1985.
E40. J.D. Jackson and E. Romero. `Simulation of the effect of dropwise deposition
of sodium on a surface using a press-formed electro-polished aluminium
specimen', Research Report, July 1985.
E39. J.D. Jackson and K.L.A. Lam. `Modifications to the glove box emissivity
rig'. Progress Report on Authority
Agreement 1R 54883, July 1985.
E38. J.D. Jackson and K.L.A. Lam. `Some measurements of the emittance of a
shallow pool of liquid sodium with an oxide layer forming on its surface'. Progress Report on UKAEA Agreement 1R 54883,
July 1985.
E37. J.D. Jackson and L. Iravanian. `Emissivity of dry sodium contaminated
surfaces'. Progress Report No. 6 on
UKAEA Agreement 1R 54894, March 1985.
E36. J.D. Jackson and L. Iravanian. `Emissivity of dry sodium contaminated
surfaces'. Progress Report No. 5 on
UKAEA Agreement 1R 54894, January 1985.
E35. J.D. Jackson and E. Romero. `Measurements of the directional emittance of
a specularly reflecting V grooved stainless steel surface and comparison with
theoretical predictions'. Research
Report, January 1985.
E34. J.D. Jackson and E. Romero. `Measurements of the directional emittance
and ratio of total hemispherical to total normal emissivity of a plane, lapped
stainless steel surface'. Research Report, January 1985.
E33. J.D. Jackson and E. Romero. `Measurements of the directional emittance
and ratio of total hemispherical to total normal emissivity of a plane machined
stainless steel surface before and after oxidation'. Research Report, January 1985.
E32. J.D. Jackson and D.K.W. Tong. `Stainless steel and liquid sodium emittance'. Progress Report No. 7 on research work under
UKAEA Agreement 4R 561 3B, December 1984.
E31. J.D. Jackson and L. Iravanian. `Emissivity of dry sodium contaminated
surfaces'. Combined Report on UKAEA
Agreement 1R 54894, October 1984.
E30. J.D. Jackson and D.W.K. Tong. `Stainless steel and liquid sodium
emittance'. Progress Report No. 6 on UKAEA Agreement 4R 561 3B, August 1984.
E29. J.D. Jackson and L. Iravanian. `Emissivity of dry sodium contaminated
surfaces'. Progress Report No. 4 on
UKAEA Agreement 1R 54894, August 1984.
E28. J.D. Jackson and L. Iravanian. `Emissivity of dry sodium contaminated
surfaces'. Progress Report No. 3 on
UKAEA Agreement 1R 54894, July 1984.
E27. J.D. Jackson and D.W.K. Tong. `Stainless steel and liquid sodium emittance'. Progress Report No. 5 on UKAEA Agreement 4R
561 3B, July 1984.
E26. J.D. Jackson and K.L.A. Lam. `Emissivity of stainless steel surfaces
involved in promoting a phase change of sodium'. Progress Report No. 3 on UKAEA Agreement 1R
54883, July 1984.
E25. J.D. Jackson, K.L.A. Lam and L.
Iravanian. `Measurements of the
emissivity of cylindrical ceramic specimens', Research Report, June 1984.
E24. J.D. Jackson and K.L.A. Lam. `Emissivity measurements on two sodium
contaminated fast reactor fuel pin samples'.
Progress Report on work carried out under UKAEA Agreement 1R 54894,
April 1984.
E23. J.D. Jackson and L.H. Zhu. `Transient boiling of liquids on pulse heated
surfaces'. Preliminary Report on Nuclear
Installations Inspectorate Contract NUC 56/9/1, March 1984.
E22. J.D. Jackson and L. Iravanian. `Emissivity of dry sodium contaminated
surfaces'. Progress Report No. 2 on
UKAEA Agreement 1R 54894, January 1984.
E21. J.D. Jackson, E. Romero, D.K.W. Tong and
K.L.A. Lam. `Emissivity of stainless
steel surfaces involved in promoting a phase change of sodium'. Progress Report No. 2 on UKAEA Agreement 1R
54883, January 1984.
E20. J.D. Jackson and D.K.W. Tong. `Stainless steel and liquid sodium
emittance'. Progress Report No. 4 on
research work under UKAEA Agreement 4R 561 3B, January 1984.
E19. J.D. Jackson. `Studies connected with film boiling
stability'. Proposal submitted to CEGB
Berkely Nuclear Laboratories, December 1983.
E18. J.D. Jackson and D.K.W. Tong. `Some controlled measurements of the
emissivity of lapped stainless steels'.
Progress Report on UKAEA Agreement 4R 54512B, August 1983.
E17. J.D. Jackson and D.K.W. Tong. `Emissivity values from measurements of
reflectivity'. Report on research
carried out for the UKAEA. Progress
Report on UKAEA Agreement 4R 54512B, June 1983.
E16. J.D. Jackson and L. Iravanian. `Emissivity of dry sodium contaminated
surfaces'. Progress Report No. 1 on
UKAEA Agreement 1R 54894, August 1983.
E15. J.D. Jackson, E. Romero and D.K.W.
Tong. `Emissivity of stainless steel
surfaces involved in promoting a phase change of sodium'. Progress Report No. 1 on UKAEA Agreement 1R
54883, August 1983.
E14. J.D. Jackson and D.K.W. Tong. `Stainless steel and liquid sodium
emittance'. Progress Report No. 3 on
research work under UKAEA Agreement 4R 561 3B, August 1983.
E13. J.D. Jackson and D.K.W. Tong. `Stainless steel and liquid sodium
emittance'. Progress Report No. 2 on
UKAEA Agreement No. 4R 561 3B, February 1983.
E12. J.D. Jackson and L. Iravanian, `Measurements of the emissivity of
as-received and oxidised stainless steel surfaces'. Progress Report on research work carried out
under UKAEA Agreement 4R 54512B, January 1983.
E11. J.D. Jackson and P.E. Whitehead. `Some further calorimetric measurements of
total hemispherical emissivity of type 316 stainless steel'. Progress Report No. 2 on UKAEA Agreement 4R
54614B, January 1983.
E10. J.D. Jackson and D.K.W. Tong. `Stainless steel and liquid sodium
emittance'. Progress Report No. 1 on
research work under UKAEA Agreement 4R 561 3B, December 1982.
E9. J.D. Jackson and P.E. Whitehead. `Calorimetric measurements of the total
hemispherical emissivity of stainless steel'. Progress Report No. 1 on UKAEA
Agreement 4R 54614B, November 1982.
E8. J.D. Jackson and D.K.W. Tong. `Stainless steel and sodium pool
emittance'. Progress Report on UKAEA
Agreements 4R 54512B and 4R 54016B, July 1982.
E7. J.D. Jackson. `Turbulent mixed convection
heat transfer to liquid sodium'.
Research Report NEL/JDJ/SEJ/2, February 1982.
E6. J.D. Jackson and D.K.W. Tong. `Sodium pool emittance'. Progress Report No. 6 on UKAEA Agreement 4R
54016B, January 1982.
E5. J.D. Jackson and D.K.W. Tong. `Sodium pool emittance'. Progress Report No. 5 on UKAEA Agreement 4R
54016B, September 1981.
E4. J.D. Jackson and D.K.W. Tong. `Sodium pool emittance'. Progress Report No. 4 on UKAEA Agreement 4R
54016B, May 1981.
E3. J.D. Jackson and D.K.W. Tong. `Sodium pool emittance'. Progress Report No. 3 on UKAEA Agreement 4R
54016B, January 1981.
E2. J.D. Jackson and D.K.W. Tong. `Sodium pool emittance'. Progress Report No. 2 on UKAEA Agreement 4R
54016B, October 1980.
E1. J.D. Jackson and D.K.W. Tong. `Sodium pool emittance'. Progress Report No. 1 on UKAEA Agreement 4R
54016b, July 1980.